Loading...
Search for: reliability-assessment
0.008 seconds
Total 51 records

    A new formulation for power system reliability assessment with AC constraints

    , Article International Journal of Electrical Power and Energy Systems ; Vol. 56, issue , March , 2014 , p. 298-306 ; ISSN: 1420615 Safdarian, A ; Fotuhi-Firuzabad, M ; Aminifar, F ; Lehtonen, M ; Sharif University of Technology
    Abstract
    Recent investigations have revealed the significant role of reactive power in blackout events. The associated disturbances frequently emerge in the form of voltage instability and collapse. Due to the computational complexity of modeling and analysis of enormous contingencies, DC approximation of the power flow, without accounting the role of reactive power, is usually used to evaluate the contingencies and to mitigate the associated probable violations. This paper, at first, presents a linear power flow model based on an approximated version of AC power flow formulation. The proposed model is then used to develop an efficient reliability assessment approach which is capable of taking both... 

    Reliability-based maintenance scheduling of generating units in restructured power systems

    , Article Turkish Journal of Electrical Engineering and Computer Sciences ; Vol. 22, issue. 5 , 2014 , p. 1147-1158 ; ISSN: 13000632 Fotuhi-Firuzabad, M ; Aminifar, F ; Shahzadeh, A ; Sharif University of Technology
    Abstract
    Maintenance scheduling of generating units in restructured power systems is a collaborative and interactive process between independent system operators (ISOs) and generating companies (GENCOs). The ISO should comply with GENCO maintenance preferences subject to targeted system reliability levels. This process might be multistage since the admission of all initial unit outage requests may threaten system reliability. Hence, the ISO accepts some proposals and determines alternatives for the remaining units. The GENCOs are then allowed to confirm the alternatives or revise them. In this paper the ISO problem of generating unit maintenance scheduling is tackled. The objective function is to... 

    Post Optimal Analysis application on the reliability evaluation of the Iran power grid

    , Article 2012 11th International Conference on Environment and Electrical Engineering, EEEIC 2012 - Conference Proceedings ; 2012 , p. 873-878 ; ISBN: 9781460000000 Safdarian, A ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    Access to a computational tractable method for representing the system more realistically has always been an important issue in power system reliability assessment. The Post Optimal Analysis (POA), as a well recognized technique to attack a set of similar optimization problems, has been successfully used to assess the reliability of composite systems. This method exploits the similarity of the system states to speed up the contingency evaluation procedure without sacrificing the accuracy of the results. In this paper, the performance and practical feasibility of the POA technique for power system reliability evaluation is tested using the Iran power grid. The POA based approach is applicable... 

    Impact of WAMS malfunction on power system reliability assessment

    , Article IEEE Transactions on Smart Grid ; Vol. 3, issue. 3 , 2012 , p. 1302-1309 ; ISSN: 19493053 Aminifar, F ; Fotuhi-Firuzabad, M ; Shahidehpour, M ; Safdarian, A ; Sharif University of Technology
    Abstract
    Monitoring/control infrastructures are often assumed to be fully reliable in power system reliability studies. However, recent investigations on blackouts have revealed the crucial impacts of monitoring/control system malfunctions. This paper addresses the impact of situational awareness and controllability on power system reliability assessment. A methodology is proposed to simulate a situation in which a limitation of either or both monitoring and control functions could spread the consequence of power system events throughout the grid. It is assumed that the monitoring/control infrastructure is based on a wide-area measurement system (WAMS). While the proposed methodology is applicable to... 

    Impacts of fault diagnosis schemes on distribution system reliability

    , Article IEEE Transactions on Smart Grid ; Vol. 3, issue. 2 , 2012 , p. 720-727 ; ISSN: 19493053 Kazemi, S ; Lehtonen, M ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    Design and development of fault diagnosis schemes (FDS) for electric power distribution systems are major steps in realizing the self-healing function of a smart distribution grid. The application of the FDS in the electric power distribution systems is mainly aimed at precise detecting and locating of the deteriorated components, thereby enhancing the quality and reliability of the electric power delivered to the customers. The impacts of two types of the FDS on distribution system reliability are compared and presented in this paper. The first type is a representative of the FDS which diagnoses the deteriorated components after their failing. However, the second type is a representative of... 

    New considerations in modern protection system quantitative reliability assessment

    , Article IEEE Transactions on Power Delivery ; Vol. 25, issue. 4 , 2010 , p. 2213-2222 ; ISSN: 8858977 Etemadi, A. H ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    Protective relay technologies have evolved from single-function electromechanical and static relays to modern multifunction digital relays over the past few years. Protection systems play a vital role in maintaining a desirable level of reliability in power systems. Thus, their own reliability should be evaluated and any cause of their malfunction should be fully comprehended. In this paper, a new reliability model is proposed that associates protection system failures to four main causes: 1) relay hardware, 2) relay software, 3) ancillary equipment, and 4) human error. In addition, this model can take other aspects of the protection system into consideration, such as human error during... 

    Reliability assessment of some high side MOSFET drivers for buck converter

    , Article 2013 3rd International Conference on Electric Power and Energy Conversion Systems, EPECS 2013, Istanbul ; 2013 ; 9781479906888 (ISBN) Javadian, V ; Kaboli, S ; Sharif University of Technology
    2013
    Abstract
    Nowadays power electronic devices have a wide usage in the industries and different electrical equipment for power conditioning. As a point of view, reliability is one of important figure of merits that should be considered to have long life time and also have more probability to do exactly the proposed mission. In this paper some methods are presented to improve the reliability of power electronic components. Also some methods of system reliability improvement are reviewed. One group of converters is DC-DC step down converter which is used in different applications such as battery charger and voltage regulator. In this paper as an example, reliability of a DC-DC step down converter with... 

    Composite power system adequacy assessment based on postoptimal analysis

    , Article Turkish Journal of Electrical Engineering and Computer Sciences ; Volume 21, Issue 1 , 2013 , Pages 90-106 ; 13000632 (ISSN) Safdarian, A ; Fotuhi Firuzabad, M ; Aminifar, F ; Sharif University of Technology
    2013
    Abstract
    The modeling and evaluation of enormous numbers of contingencies are the most challenging impediments associated with composite power system adequacy assessment, particularly for large-scale power systems. Optimal power flow (OPF) solution, as a widely common approach, is normally employed to model and analyze each individual contingency as an independent problem. However, mathematical representations associated with diverse states are slightly different in one or a few generating units, line outages, or trivial load variations. This inherent attribute brings a promising idea to speed up the contingency evaluation procedure. In this paper, postoptimal analysis (POA), as a well-recognized... 

    Constructing the Bayesian network for components reliability importance ranking in composite power systems

    , Article International Journal of Electrical Power and Energy Systems ; Volume 43, Issue 1 , 2012 , Pages 474-480 ; 01420615 (ISSN) Daemi, T ; Ebrahimi, A ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Abstract
    In this paper, Bayesian Network (BN) is used for reliability assessment of composite power systems with emphasis on the importance of system components. A simple approach is presented to construct the BN associated with a given power system. The approach is based on the capability of the BN to learn from data which makes it possible to be applied to large power systems. The required training data is provided by state sampling using the Monte Carlo simulation. The constructed BN is then used to perform different probabilistic assessments such as ranking the criticality and importance of system components from reliability perspective. The BN is also used to compute the frequency and... 

    Compromising wind and solar energies from the power system adequacy viewpoint

    , Article IEEE Transactions on Power Systems ; Volume 27, Issue 4 , 2012 , Pages 2368-2376 ; 08858950 (ISSN) Safdarian, A ; Fotuhi Firuzabad, M ; Aminifar, F ; Sharif University of Technology
    IEEE  2012
    Abstract
    Miscellaneous sorts of renewable energies, despite of their positive impacts on the power system operation cost and environmental concerns, could jeopardize the system reliability due to introducing significant degrees of intermittency and uncertainty. This challenge could be overcome by composing various sources of renewable energies with complimentary natures. This paper devises an explicit mathematical framework to compromise the contribution of wind and solar energies. The optimization problem is to maximize the system reliability subject to a fixed monetary investment associated with both wind and solar. The problem formulation is based on mixed-integer programming (MIP) format in which... 

    Post Optimal Analysis application on the reliability evaluation of the Iran power grid

    , Article EEEIC 2012, Venice, 18 May 2012 through 25 May 2012 ference on Environment and Electrical Engineering, EE ; 2012 , Pages 873-878 ; 9781457718281 (ISBN) Safdarian, A ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    IEEE  2012
    Abstract
    Access to a computational tractable method for representing the system more realistically has always been an important issue in power system reliability assessment. The Post Optimal Analysis (POA), as a well recognized technique to attack a set of similar optimization problems, has been successfully used to assess the reliability of composite systems. This method exploits the similarity of the system states to speed up the contingency evaluation procedure without sacrificing the accuracy of the results. In this paper, the performance and practical feasibility of the POA technique for power system reliability evaluation is tested using the Iran power grid. The POA based approach is applicable... 

    Impact of WAMS malfunction on power system reliability assessment

    , Article IEEE Transactions on Smart Grid ; Volume 3, Issue 3 , 2012 , Pages 1302-1309 ; 19493053 (ISSN) Aminifar, F ; Fotuhi Firuzabad, M ; Shahidehpour, M ; Safdarian, A ; Sharif University of Technology
    2012
    Abstract
    Monitoring/control infrastructures are often assumed to be fully reliable in power system reliability studies. However, recent investigations on blackouts have revealed the crucial impacts of monitoring/control system malfunctions. This paper addresses the impact of situational awareness and controllability on power system reliability assessment. A methodology is proposed to simulate a situation in which a limitation of either or both monitoring and control functions could spread the consequence of power system events throughout the grid. It is assumed that the monitoring/control infrastructure is based on a wide-area measurement system (WAMS). While the proposed methodology is applicable to... 

    Impacts of fault diagnosis schemes on distribution system reliability

    , Article IEEE Transactions on Smart Grid ; Volume 3, Issue 2 , February , 2012 , Pages 720-727 ; 19493053 (ISSN) Kazemi, S ; Lehtonen, M ; Fotuhi Firuzabad, M ; Sharif University of Technology
    2012
    Abstract
    Design and development of fault diagnosis schemes (FDS) for electric power distribution systems are major steps in realizing the self-healing function of a smart distribution grid. The application of the FDS in the electric power distribution systems is mainly aimed at precise detecting and locating of the deteriorated components, thereby enhancing the quality and reliability of the electric power delivered to the customers. The impacts of two types of the FDS on distribution system reliability are compared and presented in this paper. The first type is a representative of the FDS which diagnoses the deteriorated components after their failing. However, the second type is a representative of... 

    Incorporating a novel confidence scoring method in a Persian spoken dialogue system

    , Article SPA 2011 - Signal Processing: Algorithms, Architectures, Arrangements, and Applications - Conference Proceedings, 29 September 2011 through 30 September 2011, Poznan ; September , 2011 , Pages 74-78 ; 9781457714863 (ISBN) Sakhaee, E ; Sameti, H ; Babaali, B ; Sharif University of Technology
    2011
    Abstract
    Reliability assessment of phonemes, syllabi, words, concepts or utterances has become the key feature of Automatic Speech Recognition (ASR) engines in order to make a decision to accept or reject a hypothesis. In this paper, we propose utterance-level confidence annotation based on combination of features extracted from multiple knowledge sources in Persian language. The experiment was conducted first to examine the performance of individual features, then to combine them using statistical data analysis and density estimation methods to assign a confidence score to utterances. Using the data collected from a Persian spoken dialogue system, we show that combining features from independent... 

    New considerations in modern protection system quantitative reliability assessment

    , Article IEEE Transactions on Power Delivery ; Volume 25, Issue 4 , September , 2010 , Pages 2213-2222 ; 08858977 (ISSN) Etemadi, A. H ; Fotuhi Firuzabad, M ; Sharif University of Technology
    2010
    Abstract
    Protective relay technologies have evolved from single-function electromechanical and static relays to modern multifunction digital relays over the past few years. Protection systems play a vital role in maintaining a desirable level of reliability in power systems. Thus, their own reliability should be evaluated and any cause of their malfunction should be fully comprehended. In this paper, a new reliability model is proposed that associates protection system failures to four main causes: 1) relay hardware, 2) relay software, 3) ancillary equipment, and 4) human error. In addition, this model can take other aspects of the protection system into consideration, such as human error during... 

    Reliability and component importance analysis of substation automation systems

    , Article International Journal of Electrical Power and Energy Systems ; Volume 49 , July , 2013 , Pages 455–463 ; 01420615 (ISSN) Hajian Hoseinabadi, H ; Sharif University of Technology
    Abstract
    This paper aims to present a comprehensive technique to quantitatively assess the reliability of substation automation systems. The technique is based on the tie-sets methodology. In order to demonstrate the application of the proposed technique, a variety of substation automation architectures is first introduced. The associated reliability block diagrams as well as the exact system reliability are then given. The impacts and the degree of importance of various components on the reliability of substation automation systems are presented. Two suitable measures of importance are selected. The first is the Birnbaum's measure used to determine the bottleneck of the system reliability. The... 

    A comprehensive approach for reliability worth assessment of the automated fault management schemes

    , Article 2010 IEEE PES Transmission and Distribution Conference and Exposition: Smart Solutions for a Changing World, 19 April 2010 through 22 April 2010 ; 2010 ; 9781424465477 (ISBN) Kazemi, S ; Lehtonen, M ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Abstract
    Distribution automation application for fault management in the electricity distribution networks is one of the main potential remedial actions to reduce customers' outage times and hence improve service reliability. For this purpose, various automation schemes have been developed and introduced in different countries and by different venders. However, the challenge for electric utilities, especially in today's competitive electricity market, is to identify and evaluate potential reliability reinforcement schemes. Accordingly, appropriate schemes must be determined and prioritized for implementation. In this context, reliability cost/worth assessment plays an important role. A comprehensive... 

    A novel method to assess distribution system reliability considering smart solar cell

    , Article 2012 2nd Iranian Conference on Smart Grids, ICSG 2012, 23 May 2012 through 24 May 2012 ; May , 2012 , Page(s): 1 - 9 ; 9781467313995 (ISBN) Rastegar, M ; Fotuhi Firuzabad, M ; Safdarian, A ; Sharif University of Technology
    Abstract
    One of the most important issues in the smart grid is to quantitatively assess the impacts of distributed energy resources (DER) on the distribution system reliability. Solar cells (SCs) as developing DERs are normally placed close to the load centers. In this paper, a new algorithm is developed to evaluate distribution system reliability, considering SCs in the vicinity of the end-users. The probabilistic nature of the demand and SC power output are investigated to solve challenges of integrating these intermittent resources with the distribution system. In a smart home, to handle the variation of SC generation, solar load controller (SLC) is utilized to match load and generation of SCs... 

    Short-Term Impacts of DR Programs on Reliability of Wind Integrated Power Systems Considering Demand-Side Uncertainties

    , Article IEEE Transactions on Power Systems ; Volume 31, Issue 3 , 2016 , Pages 2481-2490 ; 08858950 (ISSN) Moshari, A ; Ebrahimi, A ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2016
    Abstract
    Meeting the reliability requirements in wind integrated power systems is a challenging problem due to the volatility of wind power generation. Wide implementation of demand response (DR) programs is an effective solution for this problem. This paper studies the impacts of DR programs on short-term reliability assessment of wind integrated power systems. A new algorithm including the effects of time and components initial states is presented for short-term reliability evaluation. This algorithm involves a multi-segment optimal power flow (OPF) approach to model the lead-time of DR and reserve resources. Taking into account the uncertainties associated with DR programs, a new model for these... 

    Guest editorial special section on microgrids

    , Article IEEE Transactions on Smart Grid ; Volume 3, Issue 4 , December , 2012 , Pages 1857-1859 ; 19493053 (ISSN) Fotuhi Firuzabad, M ; Iravani, R ; Aminifar, F ; Hatziargyriou, N ; Lehtonen, M ; Sharif University of Technology
    Abstract
    Despite the significant research efforts devoted to the microgrid and smart grid areas, numerous problems related to real world implementations still remain unsolved. The present special issue was announced with the objective of addressing and disseminating state-of-the-art R&D results on microgrids to bring together researchers from both academia and industry with the goal of fostering interactions among stakeholders. In response, 190 two-page extended abstracts were received and considered for the first round of reviews. Authors of about 60 selected abstracts were then invited to submit the full papers in the second round and out of them 27 high-quality manuscripts were ultimately approved...